| WAP/PMGSY(JCB)/2025-26/04/Package-5 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, Bageshwar, and Tehri Uttarakhand. |
M/s P. S. Kuwarbi and Co. |
Sep. 03, 2025 |
872842.46
|
| WAP/PMGSY(JCB)/2025-26/04/Package-3 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, Bageshwar, and Tehri Uttarakhand. |
M/s P. S. Kuwarbi and Co. |
Sep. 03, 2025 |
513799.14
|
| WAP/PMGSY/2025-26/Maintenance/EM7 Ghuttu |
Emergency Maintenance/ Repair work of damaged parts of roads in Block Bhilangna, Distt. Tehri Garhwal, Under State Disaster Mitigation Fund (SDMF) |
M/s Chandan Singh Chauhan |
Sep. 01, 2025 |
857163.80
|
| WAP/PMGSY/2025-26/Maintenance/EM7 Vinaykhal |
Emergency Maintenance/ Repair work of damaged parts of roads in Block Bhilangna, Distt. Tehri Garhwal, Under State Disaster Mitigation Fund (SDMF). |
M/s Chandan Singh Chauhan |
Sep. 01, 2025 |
1249433.56
|
| WAP/ROPEWAYS/2025-26/04 (Call 3) |
RENOVATION OF EXISTING STROM WATER DRAIN NETWORK & PROVISION OF STP WITH SEWERAGE NETWORK AT MTPF AMBERNATH, MAHARASHTRA (Call 3) |
M/s Vikash Enterprises |
Aug. 25, 2025 |
115481609.67
|
| WAP/ROPEWAYS/2025-26/05 |
DEVELOPMENT OF FABRICATION SHOP AT MTPF AMBERNATH, MAHARASHTRA |
M/s Paradise Construction |
Aug. 22, 2025 |
73573355.95
|
| WAP/INFRA/KERALA/2025/EMLM/510 |
CONVERSION OF CHC TO BLOCK FAMILY HEALTH CENTRE AT CHC ENADIMANGALAM AT PATHANAMTHITTA |
M/s. DORA INFRASTRUCTURES AND PROPERTIES Pvt LIMITED |
Aug. 20, 2025 |
3399427.78
|
| GEM/2024/B/5363710 |
Hiring of NABL accredited Laboratory for testing purpose at 3 locations i.e., Vijayawada, Visakhapatnam and Tirupati zones for PMC & TPQC services of MPFC’s of APAGMKT Project |
Siri GEO solutions pvt Ltd. Hyderabad |
Aug. 19, 2025 |
2265000.00
|
| WAP/ROPEWAYS/2025-26/06 |
EAST GATE RENOVATION, SECURITY BUILDING & INFRASTRUCTURE DEVELOPMENT AT MTPF AVNL, AMBERNATH, MAHARASHTRA |
M/s Kumar Enterprises & Co. |
Aug. 14, 2025 |
86779459.44
|
| WAP/ENVT/ESIC ROHINI/SR/PKG-7/2025/07 |
SPECIAL REPAIR WORKS- REPLACEMENT/REPAIR OF WATER PIPE LINE IN STAFF COLONY IN SEC-15, ESIC ROHINI, NEW DELHI (PACKAGE-7) |
M/s HST Enterprises (Awarded on percentage basis - % below) |
Aug. 13, 2025 |
3.13
|
| WAP/ENVT/ESIC LUDHIANA/SR/PKG-IV/2025/04 |
SPECIAL REPAIR WORK- RENOVATION (CIVIL & ELECTRICAL) WORKS IN VARIOUS LOCATIONS AT ESIC HOSPITAL, LUDHIANA (PACKAGE-4) |
M/s Adit Fabrications (Awarded on percentage basis - % below) |
Aug. 13, 2025 |
2.01
|
| WAP/INFRA/KERALA/2025/TRUV/505 |
ESTABLISHING TRANSLATIONAL RESEARCH CENTRE FOR THE UNIVERSITY CAMPUS AT VILAPPILSALA |
M/s. Saraswathy Constructions |
Aug. 11, 2025 |
113068516.90
|
| WAP/ROPEWAYS/2024-25/12 |
RENOVATION OF ADMIN BLOCK AND REDEVELOPMENT OF RECEPTION BUILDING, MAIN GATE AND SECURITY OFFICE AT MTPF AMBERNATH, MAHARASHTRA |
M/s Paradise Construction |
Aug. 08, 2025 |
138618102.66
|
| WAP/ENVT/ESIC-ARMO/HEADQUARTERS/2025/01 |
COMPREHENSIVE ANNUAL REPAIRS, MAINTENANCE & OPERATION WORKS (CIVIL & ELECTRICAL) OF ESIC HEADQUARTERS OFFICE BUILDING/EXTN. OFFICE AND ITS PREMISES |
M/s S.K Construction Co (Awarded on percentage basis - % Below) |
Aug. 08, 2025 |
0.31
|
| WAP/ENVT/ESIC-ARMO/CHANDIGARH/2025/01 |
ANNUAL REPAIR, MAINTENANCE & OPERATION (ARMO) WORKS (CIVIL, ELECTRICAL AND HORTICULTURE) FOR ESIC MODEL HOSPITAL RAM DARBAR, CHANDIGARH (PACKAGE-1) |
M/s Adit Fabrications (Awarded on percentage basis - % below) |
Aug. 08, 2025 |
2.05
|
| WAP/ENVT/GNFSU/2024-25/03 |
CONSTRUCTION FOR GUJARAT NATURAL FARMING SCIENCE UNIVERSITY, AT JAMBUDI VILLAGE, TALUKA HALOL, PANCHMAHAL DISTRICT (E+D1 TYPE QUARTER, E2+E1 TYPE QUARTER, UG GIRLS HOSTEL, UG BOYS HOSTEL, FARM STRUCTURE, GAU SHALA, COMPOUND WALL & WATCHMAN CABIN AT GIRLS HOSTEL, POSITIVE MILLET LAB, BIO INPUT LAB, WBM APPROACH ROAD, WATER SUPPLY AND 6.0LAC. LITER ESR AND FURNITURE WORK AT HALOL) |
M/s Shantilal B. Patel |
Aug. 05, 2025 |
451212655.89
|
| WAP/PMGSY/2025-26/Maintenance/EM6 |
Reconstruction work of damaged wall and culvert at Km. 1.00 to 4.00, Km. 5.00 to 8.00, Km. 9.00 to 12.00 and Km. 13.00 to 16.00 of Bageshwar-Kapkot Motor Road to Beda-Majedha Motor Road. Block-Kapkot, Distt. Bageshawar. under Natural Disaster year 2024-25 |
M/s Kanchan Singh |
Jul. 25, 2025 |
1036953.32
|
| WAP/PMGSY/JCB/2025-26/01/Package-13 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, Bageshwar, Mori and Tehri Garhwal, Uttarakhand |
M/s Suresh Himani |
Jul. 25, 2025 |
1784726.40
|
| WAP/PMGSY/JCB/2025-26/01/Package-14 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, Bageshwar, Mori and Tehri Garhwal, Uttarakhand. |
M/s Trepan Singh Chauhan |
Jul. 25, 2025 |
708354.00
|
| WAP/PMGSY(JCB)/2025-26/01Package-13 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, Bageshwar, Mori and Tehri Garhwal, Uttarakhand. |
M/s Suresh Himani |
Jul. 25, 2025 |
1784726.40
|