| WAP/PMGSY(JCB)/2025-26/01/Package-15 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, Bageshwar, Mori and Tehri Garhwal, Uttarakhand |
M/s Chandan Singh Chauhan |
Oct. 01, 2025 |
1606806.00
|
| WAP/INFRA/KERALA/2025/OPDU/516 |
CONSTRUCTION OF OPD COMPLEX FOR THE DEVELOPMENT OF GOVERNMENT AYURVEDA MEDICAL COLLEGE AT UDUMBANCHOLA, IDUKKI |
M/s. SAAJ Constructions |
Sep. 30, 2025 |
95041790.71
|
| WAP/PMGSY(JCB)/2025-26/02/Package-1 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, and Bageshwar, Uttarakhand |
M/s P. S. Kuwarbi and Co |
Sep. 27, 2025 |
717836.48
|
| WAP/ENVT/ESIC/SR-MAHARASHTRA/PKG-7/2025/07 |
SPECIAL REPAIR WORK OF CIVIL AT ESIS HOSPITAL, ULHASNAGAR, MUMBAI, MAHARASHTRA (PACKAGE-7) |
M/s Saraswati Engineers (Awarded on percentage basis - % below) |
Sep. 25, 2025 |
2.01
|
| WAP/ENVT/ESIC/SR-MAHARASHTRA/PKG-6/2025/06 |
SPECIAL REPAIR WORK (CIVIL) AT ESIS HOSPITAL AND STAFF QUARTERS AT KANDIVALI, MUMBAI, MAHARASHTRA, (PACKAGE-6) |
M/s Sarathi Enterprises (Awarded on percentage basis - % below) |
Sep. 25, 2025 |
1.08
|
| GEM/2025/B/6517127 |
Topographical survey (DGPS and GIS System) and hydraulic design to establish water supply and sewerage systems in 25 villages, 81 newly approved colonies and remaining/ balance areas of wards for Faridabad town |
Ram Narain Jain Contractor |
Sep. 24, 2025 |
2470920.00
|
| WAP/INFRA/KERALA/2025/KPZI/513 |
WATER SUPPLY ARRANGEMENT FOR DRAWING 3 MLD RAW WATER FROM PAZHASSI RESERVOIR TO KINFRA INDUSTRIAL PARK, MATTANNUR – PHASE 1 |
M/s. KK SURENDRAN |
Sep. 23, 2025 |
29447078.73
|
| WAP/PMGSY/2025-26/Maintenance/EM8 |
Reconstruction work of damaged wall form Km- 1.00 to 3.00 and 4.00 to 7.00 of Bhanar Lethi to Namti Chetabagar Motor Road. Block-Kapkot, Distt. Bageshawar under Natural Disaster 2024-25. |
M/s Ranjeet Singh Dharamshatu |
Sep. 22, 2025 |
419170.22
|
| GEM/2025/B/6258266 |
CARRYING OUT GEOTECHNICAL INVESTIGATION FOR UPDATION OF DETAILED PROJECT REPORT (DPR) OF NATIONAL WATERWAY (NW) – 5 |
M/s Idhitri Geoservices Pvt. Ltd |
Sep. 19, 2025 |
3071084.00
|
| WAP/PMGSY(JCB)/2025-26/02/Package-6 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, and Bageshwar, Uttarakhand |
M/s P. S. Kuwarbi and Co |
Sep. 18, 2025 |
717871.88
|
| WAP/PMGSY(JCB)/2025-26/02/Package-12 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, and Bageshwar, Uttarakhand |
M/s Ranjeet Singh Dharamshatu |
Sep. 18, 2025 |
674960.00
|
| WAP/PMGSY(JCB)/2025-26/02/Package-2 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, and Bageshwar, Uttarakhand |
M/s P. S. Kuwarbi and Co |
Sep. 18, 2025 |
614921.60
|
| WAP/PMGSY(JCB)/2025-26/02/Package-11 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, and Bageshwar, Uttarakhand |
M/s Ranjeet Singh Dharamshatu |
Sep. 18, 2025 |
484803.00
|
| WAP/ENVT/ESIC/SR-JOKA/PKG-2/2025/02 |
SPECIAL REPAIR WORKS (CIVIL) IN ESIC PGIMSR,MEDICAL COLLEGE AND HOSPITAL – JOKA (PACKAGE-2) |
M/s Sagar Aircon Pvt Ltd (Awarded on percentage basis - % below) |
Sep. 17, 2025 |
1.67
|
| WAP/ENVT/PGICH/SR-E&FF/PKG-14/2025/14 |
SPECIAL REPAIR WORKS: REPAIRING AND REPLACEMENT WORK RELATED TO ELECTRICAL AND FIRE FIGHTING AT PGICH, SECTOR 30 NOIDA (PACKAGE-14) |
M/s Sagar Aircon Pvt Ltd (Awarded on percentage basis - % below) |
Sep. 17, 2025 |
1.22
|
| WAP/PMGSY(JCB)/2025-26/04/Package-16 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, Bageshwar, and Tehri Uttarakhand |
M/s Surya Prakash Raturi |
Sep. 09, 2025 |
623512.00
|
| WAP/PMGSY(JCB)/2025-26/04/Package-9 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, Bageshwar, and Tehri Uttarakhand. |
M/s Harish Giri |
Sep. 04, 2025 |
175654.80
|
| WAP/PMGSY(JCB)/2025-26/04/Package-8 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, Bageshwar, and Tehri Uttarakhand. |
M/s Harish Giri |
Sep. 04, 2025 |
502434.56
|
| WAP/PMGSY(JCB)/2025-26/04/Package-4 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, Bageshwar, and Tehri Uttarakhand. |
M/s P. S. Kuwarbi and Co. |
Sep. 04, 2025 |
437401.22
|
| WAP/PMGSY(JCB)/2025-26/04/Package-5 |
Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Road under PMGSY in Uttarakhand damaged during Monsoon Period (Jun-September) for Year 2025-26 in Distt. Almora, Bageshwar, and Tehri Uttarakhand. |
M/s P. S. Kuwarbi and Co. |
Sep. 03, 2025 |
872842.46
|